Pre-Equipping Car Parks With Charging Stations: What the Law (LOM) Says

LOM law and car park pre-equipping: who is affected, deadlines, minimum charge points. The compliance guide for property managers and businesses.

11 min read Lire en français
  • QUALIFELEC IRVE-qualified company
  • AXA decennial liability insurance
  • Across France
  • Target: quote within 48 h after a complete brief
  • OCPP supervision
  • ADVENIR grants
  • QUALIFELEC IRVE-qualified company
  • AXA decennial liability insurance
  • Across France
  • Target: quote within 48 h after a complete brief
  • OCPP supervision
  • ADVENIR grants
Vehicle compatibility

Find a charger compatible with your electric vehicle

We check your vehicle’s connector, accepted charging power and electrical supply before recommending a compatible charger.

  • Tesla
  • Renault
  • Peugeot
  • Citroën
  • BMW
  • Audi
  • Mercedes
  • Volkswagen
  • Nissan
  • Hyundai
  • Kia
  • Volvo
  • Ford
  • Dacia
  • Fiat
  • Opel
  • Škoda
  • MG
  • Toyota
  • Polestar
  • MINI
  • Jeep
  • Porsche

For a property manager, a landlord or a company director, pre-equipping car parks with charging stations is no longer an option: it is a regulatory obligation that applies, to varying degrees, to many buildings. Anticipating this issue means avoiding costly emergency works and securing the value of your property portfolio. Here is a clear overview of what the law provides for — without guesswork, and with the right reflexes to check which obligation applies to your building.

What is car park pre-equipping?

Pre-equipping is a concept often confused with installing charging stations. It is in fact a separate, earlier step: preparing the car park's infrastructure so that a charging station can be connected quickly and at lower cost, the day the need arises.

In concrete terms, pre-equipping a parking space means putting in place the passive components required for future charging:

  • Cable routing: ducting, cable trays or conduits running from the electrical panel to the spaces concerned.
  • Electrical provisions: the pathway that lets you pull the supply cables later on without reopening floors or drilling through structures.
  • Sizing the plant room and the panel so they can ultimately accommodate the power required for several charge points.

The idea is simple: the heavy structural work for the connection is done up front. When a user wants a charging station, all that remains is to fit the equipment and pull the cable through the ducting already in place, without breaking up the surface or undertaking major works. Pre-equipping is therefore a preparatory investment, not an immediate commissioning.

Pre-equipping and installed charge points: an essential difference

The regulations distinguish between two requirements that must not be confused, because they do not carry the same obligations or the same costs.

  • Pre-equipping concerns passive infrastructure: a certain percentage of spaces must be made “ready to receive” a charging station, via the ducting and provisions described above.
  • The actual installation of charge points corresponds to charging stations physically fitted and operational, in a minimum number, on certain car parks.

Depending on the type of building, its use (commercial, multi-unit residential, public-facing) and the size of its car park, the regulations may require one, the other, or both. A building may thus be required to pre-equip a large share of its spaces and to install a minimum number of active charging stations. Understanding this distinction clearly is essential to correctly assess your obligation — and its cost.

Who is affected by the obligation?

This is the central question, and the answer depends on several criteria. The principle set out by the law is that, beyond a certain number of parking spaces, the car parks attached to certain buildings must be pre-equipped, or even fitted with charge points.

The following are covered, according to thresholds and rules specific to each case:

  • Non-residential buildings: office buildings, business premises, shops, public-facing buildings whose car parks exceed a certain number of spaces.
  • Multi-unit residential buildings: condominiums and collective housing with a car park above a threshold number of spaces.
  • New and existing buildings alike: the regulations treat new construction (and major renovations), where the requirement is built into the project, differently from the existing stock, which is subject to its own obligations with their own deadlines.

The level of obligation — the proportion of spaces to pre-equip, the number of charging stations to install — varies according to these categories and according to the size of the car park. It is therefore not a single rule but a set of requirements. This is precisely why a case-by-case assessment is necessary: two neighbouring buildings may fall under different obligations.

The regulations set numerical thresholds (number of spaces, proportion to pre-equip) that depend on the nature of the building and its construction date. These values change: do not rely on a figure “heard somewhere”. Have the exact obligation applicable to your building verified against the regulations in force.

The role of the LOM law and its decrees

The framework for these obligations comes from the Mobility Orientation Law (LOM), which made the development of electric charging a structuring pillar of mobility policy. The LOM sets out the principles; it is then the implementing decrees and orders that set the practical arrangements: space thresholds, proportions to pre-equip, minimum number of charge points, and the compliance timetable.

Several texts combine and interlock with other provisions, in particular those arising from construction law and from European regulations transposed into French law. For the manager, grasping the essentials is enough: the obligation exists, it is progressive, and its precise parameters are set by regulation and liable to change. This is why we stress checking at the time of your project rather than memorising a given threshold.

Regulatory deadlines: a timetable to verify

Bringing a building into compliance cannot be done overnight. The regulations provide for deadlines, that is, dates before which the buildings concerned must meet their obligations for pre-equipping and, where applicable, for installing charge points.

These deadlines differ depending on the situation:

  • New buildings incorporate the obligation from the design and construction stage.
  • Existing buildings are subject to their own deadlines, sometimes staggered according to the size of the car park or the nature of the activity.

Because these dates are set by decree and may be subject to adjustments, it would be unwise to put forward a fixed timetable here. The right approach is to have the deadline applicable to your building established by a professional, based on its category and its situation. The stakes are real: once the deadline has passed, a non-compliant building faces compliance obligations, and urgency always drives up the cost of works.

Not sure about your project?

A question about your installation?

The right power rating, grants, lead times: our IRVE-qualified experts answer all your questions and point you to the best solution for your situation.

Ask an expert
  • Fast reply
  • Tailored advice
  • No obligation

How do you achieve compliance?

Achieving compliance follows a project logic, which starts with the assessment and ends with an infrastructure designed to last. At Volticom, we structure this approach into clear stages.

1. The compliance audit

An essential first step: determining precisely which obligation your building is subject to. The audit identifies the building's category, the number of spaces, the applicable deadline and the gap between the existing situation and the regulatory target. It is this assessment that turns a vague obligation into a costed action plan.

2. Sizing and future-proof pre-cabling

The most costly mistake is to pre-equip “to the minimum” without anticipating the increase in demand. We favour future-proof pre-cabling: an infrastructure sized to absorb not only the immediate obligation, but also future needs, as the share of electric vehicles increases. This requires a panel and cable routes that are correctly calibrated from the outset, to avoid having to redo everything in a few years.

3. Installation and supervision

When charge points have to be installed, they are fitted by QUALIFELEC IRVE-qualified technicians, as the regulations require beyond a certain power level. On a shared car park, supervision comes into its own: power management, access control, consumption monitoring and, where applicable, rebilling to users.

Available subsidies

Bringing a car park into compliance represents an investment, but support schemes exist to ease the cost. ADVENIR does not fund chargers in individual houses. Projects in apartment buildings may qualify; for other uses, check the relevant scheme and confirm eligibility before work begins.

The amounts, caps and conditions of these subsidies change regularly and depend on your situation: we therefore do not quote figures that would quickly become outdated. Only deduct a grant from your budget after the project’s eligibility and payment conditions have been confirmed. Support with subsidies is an integral part of the compliance process: it would be a shame to undertake mandatory works without drawing on the support you are entitled to.

Cost and planning: why anticipating changes everything

The cost of pre-equipping depends on too many parameters to be announced without a study: the size of the car park, the distance to the panel, the available power, the nature of the floors, the proportion of spaces concerned. Any serious estimate requires a site visit and a sizing exercise. One principle, however, is constant: anticipating costs less than enduring.

Several reasons explain this:

  • Combine works. Pre-equipping during a car park renovation, a waterproofing repair or a roadway resurfacing makes it possible to share civil-engineering costs rather than reopening the floors specifically for charging.
  • Avoid regulatory urgency. A compliance project carried out in haste, as a deadline approaches, leaves little room for negotiation and optimisation.
  • Preserve the building's value. A property portfolio that is compliant and ready to host charging is more attractive, both for letting and for resale.

Planning pre-equipping therefore turns a constraint into a lever: the obligation becomes the opportunity to modernise the infrastructure at the best cost, at the right time.

FAQ

Pre-equipping and the LOM obligation

Is my building necessarily affected?

It depends on its nature (commercial, multi-unit residential, public-facing), on whether it is new or existing, and on the size of its car park. Beyond a certain number of spaces, the obligation applies according to rules specific to each case. Only an audit can determine this with certainty.

Are pre-equipping and an installed charging station the same thing?

No. Pre-equipping prepares the infrastructure (ducting, provisions, passive cabling) for future charging. Installing charge points corresponds to charging stations physically fitted and operational. Depending on your building, you may be subject to one, the other, or both.

What is the deadline for me to become compliant?

The deadlines are set by decree and vary according to the building's category and the size of the car park. Rather than relying on a date that could change, have the precise deadline applicable to your situation established, in line with the regulations in force.

Are there subsidies to finance these works?

Only deduct a grant from your budget after the project’s eligibility and payment conditions have been confirmed. As the amounts change regularly, have your eligibility checked at the time of the project. Only deduct a grant from your budget after the project’s eligibility and payment conditions have been confirmed.

How much does it cost to pre-equip a car park?

The cost depends on too many parameters to be announced blindly: the size of the car park, the distance to the electrical panel, the available power and the proportion of spaces concerned. That is why we price every project by quote, free of charge and within 48 hours, across France, after a study of your car park. Only deduct a grant from your budget after the project’s eligibility and payment conditions have been confirmed.

Can I carry out the pre-equipping myself or with my usual electrician?

Passive pre-cabling may seem simple, but poorly calibrated sizing will force you to redo everything as soon as the charging stations are installed. Beyond a certain power level, the installation of charge points must be entrusted to a QUALIFELEC IRVE-qualified technician, as the regulations require. At Volticom, our IRVE-qualified partner installers design, from the outset, a future-proof infrastructure compliant with the NF C 15-100 standard, which secures your investment.

How long should I allow between the quote and compliance?

It all starts with our detailed quote, delivered within 48 hours after the study of your car park, across France, with no commitment on your part. The work timeframes then depend on the scale of the project, but anticipating remains key: a compliance project carried out in a rush, as a deadline approaches, leaves little room for negotiation. It is better to plan calmly than to endure hasty, more costly works.

What guarantees and insurance cover the works?

All our projects come with a decennial liability insurance policy with AXA, subject to the declared activities, limits and terms of the current insurance certificate, as well as our professional liability insurance taken out with AXA. You are thus covered over time, with a single point of contact for the audit, the installation and the follow-up. Only deduct a grant from your budget after the project’s eligibility and payment conditions have been confirmed.

What happens in the event of a fault after installation?

Our charging stations are supervisable (OCPP protocol), which allows remote monitoring and rapid detection of anomalies. If needed, our after-sales service stays responsive, and the decennial liability insurance policy with AXA, subject to the declared activities, limits and terms of the current insurance certificate applies to the entire installation. You thus keep an operational car park and ongoing support, well beyond the installation itself.

How can I find out precisely which obligation applies to my building?

The thresholds, proportions and deadlines vary according to the nature of the building, its construction date and the size of its car park: two neighbouring buildings may fall under different obligations. Rather than relying on a figure heard somewhere, ask for our compliance audit, priced free of charge within 48 hours, across France and with no commitment. We identify your exact deadline, the gap to close and the subsidies available for a clear action plan.

Have your car park's compliance audited with Volticom

Car park pre-equipping arising from the LOM law is a progressive obligation, which depends on the nature of your building, the size of its car park and deadlines set by decree. Rather than relying on figures liable to change, the right approach is to have the exact obligation applicable to your building verified, then plan the works calmly. Only deduct a grant from your budget after the project’s eligibility and payment conditions have been confirmed. To find out your obligation and the cost of your compliance, request your free compliance audit: we study your car park, your deadline and the subsidies available.

Your quote within 48 hours after a complete brief, across France

Free assessment by a QUALIFELEC-qualified IRVE installer, anywhere in France.

QUALIFELEC IRVE · AXA decennial liability insurance

ML

Written by

Maxime Le Bourgeois

Technical Director, IRVE · EV Charging Infrastructure Expert

Maxime oversees the technical aspects and NF C 15-100 compliance of EV charging station installations at Volticom.

Official sources and verification

Sources consulted for this article, in French unless stated otherwise. Regulations and schemes may change: check the version in force before deciding.

Partners

Trusted by leading partners

Operators and industrial groups that rely on Volticom for EV charging projects.

  • Circet France
  • SFR
  • Bouygues Telecom
  • Akkodis
  • Altice
  • AGH
  • Rhôn Telecom
  • Delta Connect
  • Eiffage Énergie Systèmes