EV Charging in Apartment Buildings: Price, Funding and Out-of-Pocket Cost (2026)
EV charging in apartment buildings: a line-by-line price breakdown, individual or collective funding, the ADVENIR grant and the property manager's role in lowering your out-of-pocket cost.
- QUALIFELEC IRVE-qualified company
- AXA decennial liability insurance
- Across France
- Target: quote within 48 h after a complete brief
- OCPP supervision
- ADVENIR grants
Compatible with all electric and plug-in hybrid vehicles
Our charging stations are compatible with every electric and plug-in hybrid vehicle, whatever the brand: Type 2 connector, the European standard (IEC 61851).
Installing an EV charging point in an apartment building always raises the same questions: how much does it cost, who pays for what, and which subsidies can bring the bill down? Between the individual solution backed by the right-to-plug, the collective infrastructure voted on at the general meeting, the ADVENIR grant and the rebilling of electricity, the financial side deserves to be laid out clearly. This guide breaks down the cost items, the available funding options and the levers for keeping your out-of-pocket cost under control, whether you are an owner, a tenant or a member of the residents' council.
Individual solution or collective infrastructure: two funding logics
Before talking figures, you need to distinguish the two main ways of fitting out a shared car park, because they don't place the costs on the same shoulders.
The individual solution: the applicant pays for their own installation
This is the model behind the right-to-plug in apartment buildings: an occupant — an owner, but also a tenant — requests the installation of a charging point on their parking space, at their own expense. They fund the entire project: the charging point itself, its electrical connection, the individual metering system and any cable-routing work required. The building, for its part, pays nothing: it simply authorises the installation to run through the common areas.
The upside: speed, with no vote or collective cash call. The downside: each applicant bears the cost of their own connection alone, which rises with the distance between their space and the electrical supply point.
The collective infrastructure: the building invests or delegates
Conversely, the collective infrastructure approach equips the car park with a dedicated charging network — a "riser" that serves all or part of the spaces. Each occupant who wishes to can then connect to it, at a far more predictable individual cost. Two variants exist:
- Funding by the building: the infrastructure works are voted on at the general meeting and split between owners according to their ownership shares; each user then pays for their own charging point and individual connection.
- Funding by a third-party operator: an infrastructure operator covers the riser and its maintenance, with no cash call for the building; it is then paid by each user through connection fees, a subscription or energy billing.
| Criterion | Individual solution | Collective infrastructure |
|---|---|---|
| Who decides? | The occupant (notification to the property manager) | The general meeting (vote) |
| Who pays for the infrastructure? | The applicant, in full | The building or a third-party operator |
| Who pays for the charging point? | The applicant | Each user, as requests come in |
| Typical use case | One or two isolated requests | Several requests or anticipating future needs |
The typical cost items of a charging point in an apartment building
The price of a project in an apartment building varies widely from one building to another: car park layout, routing distances, condition of the existing electrical installation. Rather than a single figure, you need to think in terms of cost items:
- The electrical connection: running cable from the supply point (the communal services meter, a new delivery point or a collective riser) to the parking space. This is often the most variable item: it all depends on the distance, the routing and the obstacles to be crossed.
- The horizontal or vertical riser (in a collective infrastructure): the distribution network that serves the spaces, sized to absorb the ramp-up in demand over the coming years.
- Metering: an MID-certified sub-meter or a dedicated individual meter, essential for assigning each user their actual consumption.
- Work in the common areas: drilling, trunking, cable trays, restoring surfaces, or even a trench for an outdoor car park.
- The charging point and its installation: the wallbox, its dedicated electrical protections (circuit breaker, suitable residual-current device) and commissioning.
- Studies and ancillary costs: prior technical survey, putting together the ADVENIR application, possible involvement of the grid operator for a new delivery point.
Depending on the project, a simple individual connection on a space close to the electrical room will remain noticeably more affordable than a distant space requiring dozens of metres of routing in the basement. To get a sense of the orders of magnitude for an installation, see our guide to EV charging point installation prices; in an apartment building, you then need to add the building's specifics. Only a technical survey allows for a reliable quote — which is precisely why Volticom provides a quote within 48 hours after a complete brief, across France after studying your configuration.
The ADVENIR grant in apartment buildings: funding dedicated to collective residential
The ADVENIR programme, funded through the energy savings certificates scheme, is the main public support for installing charging points in collective housing. Subject to the scale in force, it can cover part of the costs in several scenarios specific to apartment buildings:
- the individual solution in collective residential: the charging point and its connection installed at an occupant's request on their space;
- the collective infrastructure: the works that equip the car park with a distribution network dedicated to charging.
The usual eligibility conditions include using an ADVENIR-accredited installer, equipment that complies with the programme's requirements and an application filed by the rules, either before or after the works depending on the scheme. The scales, ceilings and criteria change regularly: always check the scale in force at the time of your project, and rely on your installer to put the application together.
Another lever not to overlook: subject to conditions, the supply and installation of a charging point in a dwelling can benefit from a reduced VAT rate of 5.5%, which directly lowers the quote. For a complete overview of the schemes you can draw on, see our guide to grants for EV charging point installation.
Expert tip: insist on certified MID individual metering from the project design stage, even for a single charging point. This is what guarantees indisputable rebilling of electricity, avoids charge disputes at the general meeting and is a prerequisite for the grant application's compliance.
A question about your installation?
The right power rating, grants, lead times: our IRVE-certified experts answer all your questions and point you to the best solution for your situation.
- Fast reply
- Tailored advice
- No obligation
Rebilling electricity: who bills whom?
A charging point in an apartment building consumes electricity that has to be attributed to someone. Three models dominate in practice:
- Connection to communal services with sub-metering: the charging point is supplied from the common-areas meter; an MID sub-meter measures each user's consumption and the property manager rebills it to the occupant, usually through the service charges. A simple model to implement, but one that requires rigorous management from the property manager.
- Individual delivery point: the occupant has their own meter and their own supply contract for their parking space. They pay their electricity supplier directly, without going through the building — the most independent solution, at the cost of an additional subscription.
- Operated collective infrastructure: the operator that funded the riser bills each user directly (connection, subscription, energy consumed), with the building staying entirely outside the financial circuit.
The right model depends on the size of the residence, the number of expected requests and the property manager's willingness to take on a rebilling role. In all cases, charging consumption must never be lumped into the common charges without metering.
The property manager's role and general-meeting timelines
The property manager is the administrative conductor of the project, and their role varies according to the chosen path.
With the individual solution: a notification, not a vote
For the right-to-plug, the occupant notifies their project to the property manager by registered letter, with a detailed description of the works and a layout plan. The property manager puts the matter on the agenda of the next general meeting for information only: no vote is required. The building can only object by referring the matter to the judicial court within three months, and only for a serious and legitimate reason — technical impossibility, for example, or a decision already taken to install a collective infrastructure. Once this period has passed without objection, the works can begin.
With the collective infrastructure: a vote at the general meeting to anticipate
The study and then the delivery of a collective infrastructure go through a vote at the general meeting. As ordinary general meetings are most often annual, the calendar becomes strategic: a matter not on the agenda has to wait another year. Submit the request to add it to the agenda to the property manager well before the notices are sent out, ideally with comparative quotes to allow for an informed vote at the first presentation. Between the initial request and commissioning, allow several months depending on the project, the general meeting often being the longest stage.
Note: for the buildings concerned, the regulations also impose car park pre-wiring obligations from the LOM law, which make future installations easier and cheaper.
Out-of-pocket cost: the levers to reduce it
Once the cost items have been identified, several levers can help bring the final bill down:
- Pool resources when it makes sense: if several occupants are considering getting equipped in the medium term, a well-sized collective infrastructure avoids multiplying costly and redundant individual connections.
- Draw on the ADVENIR grant according to the scale in force, by going through an accredited installer who puts the application together.
- Check the reduced 5.5% VAT applicable, subject to conditions, to the supply and installation in residential housing.
- Choose the right metering model from the outset, to avoid costly installation reworks when requests start to multiply.
- Compare detailed, line-by-line quotes: our guide on how to choose an IRVE installer recaps the points to check — qualification, warranties, insurance, after-sales service.
One last point: an IRVE-certified charging point installation carried out by the book is a prerequisite for the building's electrical safety, obtaining the ADVENIR grant and the installation's insurance cover all at once. It is the foundation of the entire financial set-up. For an estimate tailored to your building, request your quote within 48 hours after a complete brief, across France.
FAQ: price and funding of a charging point in an apartment building
Who pays for the EV charging point in an apartment building?
With the individual solution (right-to-plug), the applicant pays for everything: charging point, connection and metering. With a collective infrastructure, the building — or a third-party operator — funds the distribution network, then each user pays for their own charging point and connection when they get equipped.
What is the price of an EV charging point in an apartment building?
There is no single price: the cost depends on the distance between the space and the supply point, the type of car park (basement or outdoor), the metering model chosen and the scale of the work in the common areas. Only a technical survey allows for a reliable quote, hence the value of a detailed quote drawn up after an on-site study.
Do you need a general-meeting vote to install your charging point?
No for an individual solution covered by the right-to-plug: a notification to the property manager is enough, with the matter put on the agenda for information only. Yes for a collective infrastructure funded by the building, which must be voted on at the general meeting.
Does the ADVENIR grant cover charging points in apartment buildings?
Yes: collective residential is one of the targets of the ADVENIR programme, both for individual solutions and for collective infrastructures, subject to the scale in force. As the amounts and conditions change regularly, have your eligibility checked at the time of the project by an accredited installer.
Can I install my EV charging point myself in an apartment building?
No: in collective housing, the installation of a charging point above 3.7 kW must be carried out by an IRVE-certified installer, in accordance with the NF C 15-100 standard and with a 30 mA Type B residual-current circuit breaker. It is also an essential condition for benefiting from the ADVENIR grant and valid insurance cover. Volticom, qualified QUALIFELEC IRVE P1·P2·P3 and RGE, handles the entire installation, often within a timeframe confirmed after the site assessment.
How long does it take between the request and commissioning?
For an individual solution covered by the right-to-plug, the installation itself is generally done within a timeframe confirmed after the site assessment once the three-month objection period has elapsed. For a collective infrastructure, expect several months instead, the general meeting being the longest stage. In all cases, Volticom provides you with a quote within 48 hours after the technical survey, following a complete brief, across France, so you can launch the project without waiting.
Is the quote really free and with no commitment?
Yes: the Volticom quote is entirely free, detailed and with no commitment on your part. After a study of your car park configuration, you receive a detailed line-by-line quote within 48 hours, across France, which you remain free to accept or not. It is the only way to obtain a reliable price, since the cost always depends on the connection distance and the work in the common areas.
Which charging power should you choose in an apartment building: 7.4, 11 or 22 kW?
The choice depends on your vehicle, your electrical installation and the residence's needs: 7.4 kW single-phase covers most residential uses, while 11 or 22 kW three-phase suit faster or shared charging. Our charging points include the OCPP protocol, load shedding and dynamic power management to avoid overloading the building's network. During the technical survey, we precisely size the power suited to your case.
What happens in the event of a breakdown after installation?
All our installations are covered by a decennial liability insurance policy with AXA, subject to the declared activities, limits and terms of the current insurance certificate, with a responsive after-sales service in the event of a problem. You are never left alone facing a malfunction: our teams handle the follow-up of the charging point and its connection after commissioning. This level of cover is an essential criterion to check before choosing an installer.
How do you accurately rebill each user's consumption?
Rebilling per kWh relies on certified individual metering, built in from the project design stage, which measures each occupant's actual consumption to avoid any charge dispute at the general meeting. Our connected charging points (OCPP) allow for transparent and indisputable rebilling of the kWh consumed. To study the metering model suited to your building, request your free quote within 48 hours, across France on 09 55 92 66 32 or at contact@volticom.fr.
Volticom supports you from the general meeting to commissioning
Volticom, an IRVE installer based in Paris and operating throughout France, is certified QUALIFELEC IRVE P1·P2·P3 and RGE. We support owners, residents' councils and property managers at every stage: on-site technical survey, choice of the individual or collective model, ADVENIR application subject to the scale in force, compliant installation and responsive after-sales service. Our installations are covered by a decennial liability insurance policy with AXA, subject to the declared activities, limits and terms of the current insurance certificate and AXA insurance. To get your quote within 48 hours after a complete brief, across France, contact our teams, call 09 55 92 66 32 or write to contact@volticom.fr.
Your quote within 48 hours after a complete brief, across France
Free assessment by a QUALIFELEC-qualified IRVE installer, anywhere in France.
QUALIFELEC IRVE · AXA decennial liability insurance

