Smart #1 charging point: which charger to choose in 2026
Smart #1: 420 km WLTP, AC charging up to 22 kW and 150 kW in DC (27 min). Which charger to install at home and how to recharge this electric SUV day to day.
- QUALIFELEC IRVE-qualified company
- AXA decennial liability insurance
- Across France
- Target: quote within 48 h after a complete brief
- OCPP supervision
- ADVENIR grants
Find a charger compatible with your electric vehicle
We check your vehicle’s connector, accepted charging power and electrical supply before recommending a compatible charger.
The Smart #1 marks a turning point for the brand: gone is the tiny two-seat city car, replaced by a generously proportioned electric urban SUV designed for the family as much as for the city. Beneath its compact bodywork, this model hides a surprisingly lively character — up to 272 hp, 0 to 100 km/h dispatched in 6.70 s and a top speed of 180 km/h — while claiming a WLTP range of 420 km. Enough to rival the segment benchmarks without abandoning the brand's clever spirit.
But behind the spec-sheet figures, one question comes up for every future owner: how do you charge your Smart #1 at home, simply and at the best cost? Because this SUV spends most of its life plugged in overnight, in a garage or under a carport. This guide covers the whole question: charging characteristics, choosing the right charger, rapid charging for long journeys and the cost of a full charge at home. The goal: to size your installation precisely, without over-specifying or underestimating it.
Smart #1: what you need to know about charging
Before talking about equipment, let's look at the figures that really matter when choosing a charger. On the Smart #1, the decisive numbers are as follows:
- Battery: 62 kWh usable (66 kWh gross) on the Pro+ trim described here; the Pure and Pro get a 47 kWh usable (49 kWh gross) battery and 310 km WLTP.
- WLTP range: 420 km — a comfortable figure for an urban SUV, easily covering a week of home-to-work trips between two charges.
- Alternating current (AC) charging power: 22 kW three-phase on the Pro+, Pro+ Black Collection, Premium and BRABUS trims — this is the model's strong point, and it's the figure that governs the choice of your home charger. Note that the Pure and Pro trims only have a 7.4 kW single-phase onboard charger, with no option to upgrade.
- Direct current (DC) charging power: 150 kW (130 kW on the Pure and Pro) — a high power level, reserved for the ultra-rapid chargers at motorway service areas.
- Connector: Type 2 for alternating current and CCS Combo 2 for rapid charging — the European standards found on every home and public charger.
The key point clearly sets the Smart #1 apart from many of its rivals: its onboard charger accepts up to 22 kW in alternating current from the Pro+ trim upwards. Where many vehicles top out at 7.4 or 11 kW, this SUV can take advantage of a powerful three-phase charger at home, which noticeably shortens charging times. Its Type 2 connector also makes it compatible with every charger on the market, with no proprietary ecosystem. If you're new to the electric world, our beginner's guide to the electric car lays down all the useful basics.
AC and DC charging: understanding the difference
All electric-car charging rests on one fundamental distinction: alternating current (AC) and direct current (DC). Understanding it means grasping why your Smart #1 recovers its range in under half an hour on the motorway, but in several hours at home — and why that gap is perfectly normal.
The battery stores its energy as direct current, whereas your home's electrical grid delivers alternating current. One must therefore be converted into the other: that's the job of the car's onboard charger. This internal component imposes a limit, which on the Smart #1 Pro+ is set at 22 kW (7.4 kW on the Pure and Pro). No AC charger will push the vehicle beyond this ceiling, but that threshold is already very high for home charging.
Direct-current charging works quite differently. On a DC rapid charger, the conversion happens outside the car, in the charger itself, and the current is injected directly into the battery. That's what allows the Smart #1 to climb up to 150 kW, a level impossible to reproduce at home. To go deeper into these notions, the article understanding kW and kWh untangles these units that are so often confused.
How long does it take to charge a Smart #1 at home?
This is the most concrete question of all. Charging time depends on two factors: the power of your charger, and the power the car accepts — here, a generous ceiling of 22 kW in alternating current. The rule is simple: the more powerful your charger, the faster the charge, until that ceiling is reached.
Here, without giving specific durations that would depend on the initial state of charge, is the hierarchy of charging solutions by power:
- Standard domestic socket (2.3 kW) — the slowest solution, to be kept for occasional emergencies. A full charge takes a considerable amount of time.
- Reinforced socket (3.7 kW) — a step up, but still slow for regular use of an SUV with this range.
- Single-phase wallbox (7.4 kW) — already much faster, enough to charge overnight for everyday use.
- Three-phase wallbox (11 kW) — more efficient still, putting some of the Smart #1's high AC charging capacity to use.
- Three-phase wallbox (22 kW) — the solution that makes full use of the model's onboard charger, for the fastest possible charges at home — Smart quotes 10 to 80% in 3 hours on a 22 kW three-phase supply.
Day to day, bear in mind that you almost never charge from 0 to 100%: an overnight top-up of a few dozen kilometres wraps up far faster than a full charge. To dig into the subject, see our feature on electric-car charging times in 2026.
Which charging point should you choose for a Smart #1?
The Smart #1 has the distinctive feature of accepting 22 kW in alternating current from the Pro+ trim upwards: that's rarer than average, and it opens up more options. On the Pure and Pro trims, limited to 7.4 kW single-phase, the 7.4 kW wallbox is the right choice and a more powerful charger would bring nothing. For the other trims, three charger levels stand out.
- The 7.4 kW wallbox (single-phase) already covers the vast majority of needs. It charges the Smart #1 overnight for everyday use and installs in most individual homes without overhauling the electrical panel. For anyone who drives moderately and charges every night, it's often the most sensible compromise between simplicity and performance.
- The 11 kW wallbox (three-phase) noticeably speeds up charging and exploits a good part of the vehicle's AC potential. It assumes a 400 V three-phase supply in your home.
- The 22 kW wallbox (three-phase) is the only one to exploit the full AC charging capacity of the Smart #1. Unlike many models that top out at 11 kW, this SUV can absorb the full power of a 22 kW charger: if you have three-phase power and often charge large amounts of energy, this is the charger that gets the most out of the vehicle at home.
The right instinct is to match the charger, the car and your electrical installation, rather than systematically aiming for maximum power. Our comparison 7.4 or 22 kW charger sets out this reasoning, and your meter's power rating remains a criterion to check before any choice — all the more so to run a 22 kW charger. If you're still unsure, the guide how to choose your charging point in 2026 walks through the method step by step.
Rapid charging for long journeys
Home charging handles day-to-day life, but the Smart #1 was also designed for long trips. On a DC rapid charger, it accepts up to 150 kW (130 kW on the Pure and Pro) — a power level that transforms the long-journey experience. Smart quotes a 10 to 80% charge in 30 minutes on a 150 kW charger, in optimal conditions: barely the time for a coffee break and the SUV has already recovered most of its range.
This DC charging is done via the CCS Combo 2 connector, the rapid-charging standard in Europe, on the high-power networks of the major operators (Ionity, Fastned, TotalEnergies, etc.). In practice, this ultra-rapid charging is kept for long-distance trips, as it places more demand on the battery than slow overnight charging. To plan your routes, our guide to motorway charging on a long journey will spare you plenty of nasty surprises.
How much does charging at home cost?
The cost of a charge is simple to work out: energy drawn from the grid × the price per kWh in your contract. As a reference, here are the prices of EDF’s regulated “Tarif Bleu” in force since 1 August 2026: €0.2001 incl. VAT per kWh on the Base option (6 kVA); on the off-peak option, €0.1589 per kWh at night and €0.2142 during peak hours (prices published by EDF, in French).
| Energy added to the battery | Off-peak hours | Base option |
|---|---|---|
| 10 kWh | €1.59 | €2.00 |
| 20 kWh | €3.18 | €4.00 |
| 30 kWh | €4.77 | €6.00 |
| 40 kWh | €6.36 | €8.00 |
To estimate a charge for your Smart #1, start from the usable capacity of your version: 62 kWh on the Pro+ (47 kWh on the Pure and Pro). A 20 to 80% charge adds about 60% of that capacity.
These amounts cover the energy stored in the battery. Charging losses come on top: in 2026 the German motoring club ADAC measured them on five cars, charging from 10 to 90%, at 5.1 to 7% on an 11 kW wallbox and 12.7 to 24.2% on a household socket (ADAC study, in German). The amounts exclude the subscription and the installation. Charging during off-peak hours cuts the price per kWh by about a quarter compared with peak hours. Our guide to home charging costs explains the method, and our feature covers scheduling charging for off-peak hours.
Installing your Smart #1 charger with Volticom
A charger, however capable, is only as good as the quality of its installation. Charging a Smart #1, especially by exploiting its 22 kW of AC charging, draws on sustained power: the installation must comply with strict safety standards — a dedicated circuit, suitable protection, earthing and, where applicable, dynamic load management so as not to overload your meter. This is all the more true for a three-phase 22 kW charger, which requires a properly sized meter and installation.
That's why Volticom works as a QUALIFELEC IRVE P1·P2·P3 installer, throughout France from our headquarters in Paris. ADVENIR does not fund chargers in individual houses. Projects in apartment buildings may qualify; for other uses, check the relevant scheme and confirm eligibility before work begins. We provide a quote within 48 hours after a complete brief, across France and offer responsive after-sales support. To understand how it works, see our pages on installing a home charging point and on choosing an IRVE installer in 2026.
Frequently asked questions
Do you need a special Smart charger to charge a #1?
No. The Smart #1 uses the Type 2 connector for alternating current, the European standard found on every wallbox on the market. A charger of any brand will charge it perfectly, as long as it speaks the Type 2 language — which is the case for all models sold in Europe.
Is a 22 kW charger really useful for the Smart #1?
Yes, and it's a genuine feature of the model. Unlike many vehicles limited to 7.4 or 11 kW in alternating current, the Smart #1 accepts up to 22 kW from the Pro+ trim upwards (the Pure and Pro stay at 7.4 kW single-phase). A three-phase 22 kW charger therefore delivers the vehicle's maximum AC charge and offers the shortest possible charging times at home, provided you have a three-phase supply.
Is a reinforced socket enough for a Smart #1?
It can serve as a stopgap or top-up, but at 3.7 kW it's slow for regular use of an SUV with this range. To make the most of the vehicle, a dedicated charger remains far more comfortable. Our comparison reinforced socket or charging point helps you decide.
Does the Smart #1 charge quickly on the motorway?
Yes. On a DC rapid charger, it accepts up to 150 kW (130 kW on the Pure and Pro), with a 10 to 80% charge quoted by Smart at 30 minutes on a 150 kW charger. Enough to string together long journeys while limiting waiting to the natural breaks of the trip.
What support is available to install a charger for my Smart #1?
Only deduct a grant from your budget after the project’s eligibility and payment conditions have been confirmed. The details of the schemes are set out in our guide to support for installing a charger in 2026.
How much does it cost to install a charger for a Smart #1?
The price depends on your home: the meter's power rating, single- or three-phase, the cable length to the charging point. Rather than putting forward a rough price, we draw up a detailed, free, no-obligation quote, targeted within 48 hours after a complete brief, across France, after a precise survey of your installation. That way you know the exact cost before any decision.
Can I install my Smart #1's charger myself?
Only deduct a grant from your budget after the project’s eligibility and payment conditions have been confirmed. Drawing 22 kW safely requires a dedicated circuit, 30 mA Type B protection and earthing compliant with the NF C 15-100 standard. As a QUALIFELEC IRVE-qualified company, we handle everything, to the highest standard.
How long does it take to install a home charger?
In the vast majority of cases, installing a wallbox for the Smart #1 takes just half a day. Once the quote is approved, we schedule a date that suits you and leave with a working charger, tested and ready to charge the very same evening. No endless worksite or heavy works in your home.
What happens if my charger breaks down after installation?
Every Volticom installation comes with a decennial liability insurance policy with AXA, subject to the declared activities, limits and terms of the current insurance certificate and responsive after-sales support in case of trouble. We are also covered by AXA insurance, which protects you fully. You are never left alone with your equipment once the technician has left.
Is my electrical installation compatible with a 22 kW charger?
A 22 kW charger requires a 400 V three-phase supply and a properly sized meter, which not every home has as standard. During our visit, we check the available power and, if needed, integrate dynamic load shedding so as never to overload your panel. If three-phase power isn't available, a 7.4 or 11 kW wallbox remains an excellent solution for your Smart #1.
What grants are available to install a home charger in 2026?
Three rules apply in 2026. Installing a charging station can qualify for the reduced 5.5% VAT rate when it is fitted in a home for its residents, with a Type 2 socket or connector (or a reinforced Type E socket), by a qualified installer (French Tax Code, art. 278-0 bis). The income-tax credit for buying and installing a charger no longer applies to expenses paid since 1 January 2026 (service-public.gouv.fr). The ADVENIR grant does not fund chargers at detached houses; in apartment buildings it may apply under conditions to be checked before the work (ADVENIR conditions). Prices and grants are covered in detail in our installation price guide.
In summary
Charging a Smart #1 at home is nothing complicated once you reason from the right figures. With its 62 kWh usable battery, its 420 km of WLTP range and above all its AC charging that climbs up to 22 kW from the Pro+ trim upwards, this urban SUV offers rare flexibility: a 7.4 kW wallbox is enough for most households — and is the most the Pure and Pro can use — an 11 kW three-phase one speeds up the pace, and a 22 kW three-phase one exploits its full potential for the fastest possible charges at home.
Ultra-rapid charging, up to 150 kW for a 10 to 80% charge in 30 minutes according to Smart, remains reserved for long journeys, while everyday life plays out at night, during off-peak hours, for a controlled cost. To turn this reasoning into a concrete, safe and lasting installation, Volticom surveys your home and provides a quote within 48 hours after a complete brief, across France: contact us for a charger designed around your Smart #1 and your habits.
Your quote within 48 hours after a complete brief, across France
Free assessment by a QUALIFELEC-qualified IRVE installer, anywhere in France.
QUALIFELEC IRVE · AXA decennial liability insurance
Official sources and verification
Sources consulted for this article, in French unless stated otherwise. Regulations and schemes may change: check the version in force before deciding.
- ADVENIR — apartment buildings; detached houses are not eligible
- ADVENIR — steps to take before the works
- Weidmüller — example of dedicated protection for a charging point
- smart — smart #1 specifications (official French site)
- smart — charging page (official French site)
- ADAC — smart #1 Pro+ data sheet (in German)
- smart — smart #1 (official French site)